01 — Permit leads · Philadelphia

Philadelphia concrete permit leads: the concrete work inside Building permits

Every week, Philadelphia publishes the building permits it just issued. I pull the commercial Building ones and send you the concrete work inside them — the rows whose work description names concrete work.

Read this first. The City of Philadelphia stopped publishing project addresses, ZIP codes, property owners, and job values in its permit feed in March 2020. Every official feed since then leaves those fields blank. So this is contractor-activity data — who pulled commercial permits, in what trade, this week — not project addresses. Anyone selling “current” Philadelphia permits with job locations is selling data that stops in March 2020.

02 — What’s in a drop

One spreadsheet, every concrete permit

Each drop is a spreadsheet (CSV + Excel) of commercial Building permits issued in Philadelphia in the last 7 days, pulled from the city’s open L&I records, updated daily at the source. Columns: permit number, issue date, permit type, type of work, contractor name as published, and the contractor’s published business address. That’s the contractor’s own business address — not the project address. Concrete work has no permit type of its own in Philadelphia — the concrete slice is the Building rows whose work description names concrete work.

First Drop covers all commercial permit types. The concrete filter is a Four Mondays and Full Quarter feature — on those, each drop is filtered to the concrete rows inside Building permits and includes a per-contractor count for the week, so you can see who’s busiest.

03 — What the data actually looks like

I checked a full month before selling it

Permits issued September 21 – October 21, 2026. Stats last checked Oct 24, 2026:

  • 221commercial Building permits in 30 days — concrete work rides inside Building permits; L&I has no separate concrete permit type
  • 88.2%of commercial rows carry the contractor name, with the contractor’s business address
  • ~245rows per weekly drop after the businesses-only filter, across all trades — the count varies by week and I state the real count on every cover sheet
  • 0phone numbers or emails anywhere in the feed, and I don’t invent them

No separate concrete count: the concrete slice is the Building rows whose work description names concrete work. The count varies week to week — every cover sheet states the real count.

Five real rows from a recent week (Oct 20, 2026) are on the Philadelphia permit leads page — same feed, same columns.

04 — Who buys it

For people who prospect concrete contractors

GCs scouting which concrete subs are busy and active. Ready-mix, formwork, and equipment-rental sales reps working a territory. Commercial insurance agents. People who prospect concrete contractors, not addresses.

05 — Packages

Pick a length. The data’s the same.

First Drop

One real week — the paid trial

$35

1 weekly drop

  • All commercial permit types
  • Per-trade summary (counts by permit type)
  • Cover sheet with date range + exact row count
  • CSV + Excel
  • No per-contractor activity ranking
  • No new-business-licenses sheet
Order First Drop — $35

Four Mondays

A month of Mondays, in a row

$115

4 consecutive weekly drops

  • Filtered to concrete rows inside Building permits
  • Per-contractor activity ranking, busiest first
  • Cover sheet with date range + exact row count
  • CSV + Excel
  • No new-business-licenses sheet
Order Four Mondays — $115

Full Quarter

Twelve weeks, plus the licenses sheet

$315

12 consecutive weekly drops

  • Filtered to concrete rows inside Building permits
  • Per-contractor activity ranking, busiest first
  • New Philly business licenses sheet — one monthly sheet per month covered
  • Cover sheet with date range + exact row count
  • CSV + Excel
Order Full Quarter — $315

Extras: a 90-day backfill file is $50. A monthly new-business-licenses sheet is $25 for First Drop and Four Mondays buyers. Ask about contractor contact enrichment or other metros before ordering — those are custom quotes, not checkbox extras.

06 — How drops work

Monday, every Monday

Drops go out every Monday, covering the previous Monday to Sunday. The cover sheet states the exact date range and row count. Thin week, thin count — I don’t pad lists to hit a number. Holiday weeks and bad-weather weeks run thinner. If a drop ever comes in under 50 commercial rows, message me and I’ll extend your package by a week. On multi-drop packages, each Monday’s file arrives in the Fiverr order messages, and the formal delivery at the end of the package contains the complete set.

07 — Order

Start with one week

Order on Fiverr — the $35 First Drop is the paid trial: one real week, priced so a sales rep can expense it without asking anyone. First Drop covers all commercial permit types — the concrete filter starts with Four Mondays.

Order on Fiverr

If a drop is wrong, message me and I’ll fix it — and if a drop ever comes in under 50 commercial rows, I’ll extend your package by a week.

Questions first? [email protected]

Philadelphia permit leads — all trades · Electrical permit leads · Plumbing permit leads · How permit leads work · FAQ